Road construction works, second phase, for the area between the two entrances to the city, with an area of 127 acres (medium-income housing buildings)
Maintenance and upgrading of the Aswan/Edfu Western Desert Road from km 55 to km 90 Aswan, with a length of about 35 km
Dualization of the Upper Egypt-Red Sea Road from the Eastern Desert Road to the Army Road, with a length of 11 km
Developing and upgrading the Suez-Ismailia road from the Mouthalath crossing, 5 km long, towards the Martyr Ahmed Hamdi Tunnel
Road maintenance (base layers and asphalt concrete repairs) in the industrial zones (first – second – third) in 6th of October City
Base layer restoration works, asphalt patches, irrigation network, curbs and sidewalks of the central island in the West Sumed area (1-2-3)
Base layer restoration works, asphalt patches, irrigation network, curbs and sidewalks of the central island in the West Sumed area (11-12)