Skip to content
El Nile
  • Home
  • About
    • About The Company
    • Organizational Structure
    • Classification and certifications
  • Business
    • Projects
    • Equipments
    • Concrete flanges
    • Maintenance and development
  • Media center
    • Events
    • News
  • العربية
Contact Us
El Nile
  • Home
  • About
    • About The Company
    • Organizational Structure
    • Classification and certifications
  • Business
    • Projects
    • Equipments
    • Concrete flanges
    • Maintenance and development
  • Media center
    • Events
    • News
  • العربية
Contact Us
Contact Us

Roads

Safaga/Qena road dualization from km 20 to km 40

Linking Sadat City to the Cairo/Alexandria Agricultural Road (Tamlay/Shibin)

Road construction works, second phase, for the area between the two entrances to the city, with an area of ​​127 acres (medium-income housing buildings)

Maintenance and upgrading of the Aswan/Edfu Western Desert Road from km 55 to km 90 Aswan, with a length of about 35 km

Dualization of the Upper Egypt-Red Sea Road from the Eastern Desert Road to the Army Road, with a length of 11 km

Developing and upgrading the Suez-Ismailia road from the Mouthalath crossing, 5 km long, towards the Martyr Ahmed Hamdi Tunnel

Road maintenance (base layers and asphalt concrete repairs) in the industrial zones (first – second – third) in 6th of October City

Base layer restoration works, asphalt patches, irrigation network, curbs and sidewalks of the central island in the West Sumed area (1-2-3)

Base layer restoration works, asphalt patches, irrigation network, curbs and sidewalks of the central island in the West Sumed area (11-12)

Duplication and upgrading of Al-Fardan-Al-Salhiya Road

Post pagination
← Previous 1 … 3 4 5 Next →

About Us

  • About
  • Classification
  • Organizational Structure
  • Contact

Business

  • Projects
  • Equipments
  • Concrete flanges
  • Maintenance and development

Media Center

  • News
  • Events

Copyright © 2025 El Nile

Powered by MediaPlan