Paving the road (Sherbin – Basandila – Belqas) (first sector) with a length of 5 km, the (Decent Life) initiative
Developing, upgrading and doubling the Western Desert Road from Aswan/Edfu, 13 km long, from km 14 to km 27
Improving the efficiency of the first phase of the Damietta/Mansoura/Mahalla/Tanta West Nile Road, from Damietta to Sherbin, from km 6 to km 16, with a length of 10 km (Decent Life)
Strengthening and constructing the expansion of Mansoura-Gamasa Road, 10 km long, from km 20 to km 30
The second phase of the Tama axis from the Western Agricultural Road to the Al-Mazoun Tunnel, with a length of 6.3 km
Developing and upgrading the Suez-Sokhna road from km 41+000 to km 50+000, with a length of about 9 km.
Road works within the project to establish a free road east of Al-Riah Al-Tawfiqi in the distance from Banha to Hala from km 7.100 to km 17.100 with a length of 10 km