Skip to content
El Nile
  • Home
  • About
    • About The Company
    • Organizational Structure
    • Classification and certifications
  • Business
    • Projects
    • Equipments
    • Concrete flanges
    • Maintenance and development
  • Media center
    • Events
    • News
  • العربية
Contact Us
El Nile
  • Home
  • About
    • About The Company
    • Organizational Structure
    • Classification and certifications
  • Business
    • Projects
    • Equipments
    • Concrete flanges
    • Maintenance and development
  • Media center
    • Events
    • News
  • العربية
Contact Us
Contact Us

Roads

Development of the Western Desert Road (Cairo/Assiut) with a length of 30 km

Doubling of Qantara East / Arish / Rafah Road in the distance from the western entrance to the eastern entrance

Construction of a 13 km long Damietta/Ras El Bar road dual carriageway

Paving the road of Al-Tasa / Jifjafa / Bir Al-Abd

Dualization of Cairo/Assiut Western Desert Road (Phase 3) with a length of 85 km

Sharm El Sheikh / Dahab dual carriageway, 80 km long

Strengthening and widening the Qena/Safaga/Luxor road

Paving Safaga / Quseir Road

Construction of the Assiut/Aswan desert road west of the Nile, with a length of 50 km

Cairo/Ismailia Desert Road Duplication

Post pagination
1 2 … 5 Next →

About Us

  • About
  • Classification
  • Organizational Structure
  • Contact

Business

  • Projects
  • Equipments
  • Concrete flanges
  • Maintenance and development

Media Center

  • News
  • Events

Copyright © 2025 El Nile

Powered by MediaPlan