• All
  • News

A bridge over the Abu Homos railway crossing in Beheira Governorate

The bridge was constructed to alleviate traffic congestion and the continuous crowding at the railway crossing in Abu Homs city, providing a new traffic axis to support the city’s urban expansion. Bridge Specifications: Length: 1,270 meters Width: 24 meters Lanes: 3 lanes in each direction Connections: 3 connections linking to the Cairo-Alexandria Agricultural Road Bridge

Aswan Dam Alternative Axis

The Aswan Dam Alternative Axis, which was inaugurated by the President via video conference today, Saturday, October 12, is one of the most important projects linking the two banks of the Nile, and was implemented by the efforts of the employees of the Holding Company for Roads and Bridges Projects through its two subsidiaries, the

Opening of the “Kafr Dawoud – Sadat” railway line

The Kafr Dawoud-Sadat railway line, which was inaugurated by the presidency today, Saturday, October 12, via video conference, is the latest new train line to serve the trade and development movement in the middle and western Delta and Lower Egypt, which comes within the framework of the political leadership’s directives to establish railway links and