


The bridge was constructed to alleviate traffic congestion and the continuous crowding at the railway crossing in Abu Homs city, providing a new traffic axis to support the city’s urban expansion.
Bridge Specifications:
Length: 1,270 meters
Width: 24 meters
Lanes: 3 lanes in each direction
Connections: 3 connections linking to the Cairo-Alexandria Agricultural Road
Bridge Intersections:
The main bridge intersects with the Cairo-Alexandria railway line.
It also intersects with the agricultural road through steel openings.
The main structure includes 3 steel openings above both the agricultural road and the railway.
The bridge covers the Abo Homs main drain for a length of 330 meters.
This project contributes to easing traffic flow, reducing congestion, and improving access to surrounding areas.